What does this scope involve?
A fit-out or refurbishment is a sequence of trades, and the order is what protects the result. Services and partitions come first, then ceilings, plaster and tiling, followed by painting, wallpaper, joinery and flooring, with final fixtures last. Concealed work has to be inspected before it is covered. Changes late in the sequence cost the most, so decisions on layout, finishes and materials are best made before work starts.
Fit-out and refurbishment projects bring multiple finishes together. The right sequence cuts rework: concealed technical work is finished and checked before ceilings and walls close, then comes surface preparation, tiling, paint, wallpaper and carpentry finishes.
